Deliverability and track record
On the Bill as a whole
For (7)
Andrew Truscott argues that separating equity and financing from contracting, rather than bundling them, could give more certainty of deliverability.
Mike Reader argues that the UK has a good track record of delivering major road projects on time, and that more optimism about this project is warranted.
Justin Madders argues that the road investment strategy provides a sustainable long-term model, and that National Highways is now skilled at delivering large projects on time and within scope.
The ORR must be fully equipped to discharge its road responsibilities, and a recent report indicated it needed to build skills and capacity. The Minister should reassure users that it will be capable.
The ORR will be resourced to deliver its duties, because the RAB model depends on an effective regulator.
Substantial preparatory work is under way to ensure the ORR can deliver its functions, and the Bill gives it the power to levy licence holders to fund this.
A plan is in place, and it would be unreasonable to have full readiness before the legislation passes. Evidence gave confidence that the right skills will be in place.
Against (3)
The Bill would allow drivers to be charged without a requirement for significant new capacity or schemes, which is unacceptable.
The Department for Transport appears to be downplaying the ORR's capability in the Railways Bill, which raises doubts about whether the framework here is deliverable.
The Minister appears to accept the ORR is not yet capable, and evidence suggested the ORR does not consider itself ready. The Government should set out its plan.
On specific amendments
reasoned amendment (unmatched to a specific amendment record)
For (1)
The Government's record of cancelling road schemes means there is no confidence it can deliver the Lower Thames Crossing on time and on budget, so the Bill should not receive a second reading.
Against (0)
None.
81 Conservative
For (1)
Local authorities and mayoral authorities should be consulted before a licence is granted for a trunk road. Failing to engage them early risks costly retrofitting and project failure.
Against (0)
None.