Costs to motorists
On the Bill as a whole
For (0)
None.
Against (14)
The Bill's sweeping powers, including the power to direct roads to become trunk roads under clause 81, could allow road charging across the whole English network through secondary legislation, and the project could have been handled by project-specific legislation instead.
Restrictions on diesel and related fuels on construction sites will raise the project's costs, which will ultimately be passed on to people who cross the Thames.
Tolls could continue long after construction costs are repaid, so the scheme could leave motorists paying far more than the tunnel cost, and dedicated legislation would be better.
The Bill opens the back door to road charging for motorists, risking charges across the network under the guise of private finance for specific projects.
Recent years have seen road charges rise, such as at Silvertown, Blackwall and Dartford, showing the cost pressure that more charging would add for drivers.
The Bill would allow drivers to be charged without a requirement for significant new capacity or schemes, which is unacceptable.
No one has said what tolls will be for private motorists or lorry drivers, and the transparency gap, together with the AA's warning about extra charges, makes the Bill unacceptable as it stands.
Ben Hopkinson argues that fuel duty is already high and that adding road user charging on top of it would be a significant burden on motorists.
Andrew Truscott says his biggest concern is the ultimate cost to end users, warning against an uneconomic toll lasting decades, and suggests fairer differentiated pricing.
Some Bill provisions appear to allow tolling and road pricing to extend well beyond the Lower Thames Crossing, whether through bad drafting or by design. The member questions whether enough attention has been paid to general motorists.
Clause 8(2)(a) allows debt limits to be set in licences, so similar parameters limiting tolls (for example, linked to build cost spread over the licence period) should also be written in to give certainty on how much motorists will pay.
Greg Smith argues that the enforcement clauses do not say what happens if the underlying technology fails, such as during an outage or cyber-attack, and that the burden could unfairly fall on motorists to prove their journey.
Greg Smith argues that the word 'could' is insufficient and that operators should be required to give more time to pay where technology fails.
Douglas Lumsden raises concern that clause 95's equipment requirement could force occasional road users, such as holidaymakers, to carry equipment they rarely need.
On specific amendments
47 Conservative
For (5)
The sustainable development duty is not about the environment as such, but about cost. Requirements such as banning diesel plant raise costs that would fall on toll payers.
Market prices show a real differential between white diesel and HVO. Operational traffic on the road will dwarf construction emissions, which has not been accounted for.
The National Highways witness based his claim of comparable cost only on HVO quotes, so the assertion rests on his view alone and is not evidenced.
Future Governments should challenge the existing DCO and contractor choices to secure value for future toll payers rather than accept prior arrangements unquestioned.
Removing the sustainable development duty would lower costs and speed delivery without relitigating the whole project; the project itself should not be stalled.
Against (0)
None.
NC4 Conservative
For (3)
Alternative construction fuels such as HVO, battery electric and hydrogen are substantially more expensive and technically immature for construction plant, so mandating or prioritising them would raise costs passed on to toll payers.
Haulage has voluntarily moved to HVO but electric is unaffordable for heavy loads; the clause would ensure licence holders minimise construction costs and therefore the eventual toll.
White diesel remains around 10-15% cheaper than HVO, and while the market is volatile, forcing construction away from white diesel would have a significant cost implication for the project.
Against (2)
Evidence from the lower Thames Crossing chief executive indicated that fuel and technology requirements had no effect on overall construction cost, so the clause is not needed.
Carbon reduction was a tender evaluation criterion; successful bidders met the target without raising overall costs, and the lowest-cost bids also had the lowest construction carbon.