The sitting focused on three clauses. The most contested concerned a proposed requirement that licence holders justify fuel and power choices for construction and maintenance. Greg Smith and Douglas Lumsden argued that alternatives such as HVO, battery electric and hydrogen are costlier and technically immature for plant and heavy haulage, that white diesel remains cheaper, and that the clause would protect toll payers by requiring value-for-money justification. Justin Madders argued against it, saying the development consent order did not prescribe fuel, industry had voluntarily adopted HVO, carbon reduction was already a tender criterion without raising costs, and the provision was over-prescriptive for a framework bill. Mike Reader and Tristan Osborne raised cost certainty and industry adaptation, and Alison Griffiths said the burden on contractors was heavier than elsewhere. Both sides also disputed what the Lower Thames Crossing evidence showed.

How members argued on the Bill overall, by party
No party data
1 for · 1 against (n=2)

Issues raised in this sitting

Construction, delivery and procurement

Project delay and deliverability, construction and project cost overruns, contractor and maintenance incentives, procurement arrangements, planning consent, and optimism in forecasts and business cases.

3 for · 4 against
4 variants

Green measures and environment

Costs of alternative fuels and red diesel changes, environmental and emissions impacts including construction emissions, and the cost burden of green policy goals.

4 for · 2 against
2 variants

Regulator capacity, powers and design

Concerns ranged from whether the regulator has the staff, skills and resources to do the job, to the breadth of its discretion and information powers, to whether it duplicates existing regulation or is needed at all.

3 for · 2 against
2 variants

Toll levels and motorist costs

Arguments ranged from general toll affordability and pricing controls, to specific toll increases and shocks, monopoly pricing, direct costs to motorists, public acceptance of tolls, and discounts for local residents.

3 for · 2 against
1 variant

Freight and business costs

Costs to freight operators and hauliers, and impacts on local businesses, including small businesses and their adaptation.

4 for · 1 against
1 variant

Regulator independence and accountability

Variants covered whether the tolls regulator is independent of government, how accountable it is to the public and Parliament, the general oversight of tolling, and whether independent review or assurance is provided.

3 for · 1 against
1 variant

Rights, appeals and redress

Appeal routes and delays, judicial warrants and civil liberties, compensation for residents and drivers, property rights and blight, and general user protections and redress.

3 for · 1 against
1 variant

Parliamentary scrutiny and delegated detail

Concerns about how much scrutiny Parliament gets, duplicated procedure, reliance on delegated and secondary legislation, the lack of technical detail and evidence, and reliance on guidance not yet published.

2 for · 1 against
2 variants

Drafting quality and legal certainty

Overall drafting clarity and consistency, vague or ambiguous wording, drafting flexibility, unnecessary prescription, legal certainty, loopholes, and whether safeguards and proportionality are adequate.

0 for · 3 against
2 variants

Scope of tolling and road pricing powers

The breadth of the bill and its clauses, whether it is scheme-agnostic and future-proof, fears of road pricing creeping beyond tolls (including airport charges), and how it sits alongside existing law and precedent.

1 for · 2 against
2 variants

Taxpayer exposure and value for money

Risks to the taxpayer and Exchequer, open-ended public liability and cost certainty, and whether the bill represents value for money.

2 for · 1 against
2 variants

Licensing scope, duration and operators

Variants covered what licences can cover and their conditions, how licences are approved, transferred or revoked, how long they run, operator incentives and accountability, vehicle classes, and market competition.

1 for · 1 against
2 variants

Private finance and investor confidence

Investor confidence and certainty, the private finance model itself, the regulated asset base model, the cost of finance, allocation of risk and moral hazard, and concession-based alternatives.

0 for · 2 against
2 variants

Technology and security

In-vehicle equipment requirements, the choice and interoperability of tolling technology, the reliability and future-proofing of technology, and cyber and national security.

1 for · 0 against
1 variant

Full transcript

The Parliamentary Under-Secretary of State for Transport (Justin Madders)
On a point of order, Mr Wishart. Fortunately, over lunchtime the lawyers have been dissecting my comments from this morning. I have been advised to make a couple of clarifications. First, clause 72 deals with a company needing to notify the Secretary of State or the ORR before the court issues permission for a voluntary winding up, not giving notice before applying for a highways administration order. I hope that is clear. Secondly, on clause 85, I need to be clear that the special administration regime is not to be used for day-to-day operations. Financial assistance under the power can be used to support the licence holder if necessary and in extraordinary circumstances.
The Chair
I am grateful to the Minister for clarifying that on the record. I think that has been appreciated and accepted by the Committee. New Clause 4 Use of vehicles, machinery and equipment for constructing, maintaining and improving the highway “A licence holder responsible for constructing, maintaining, or improving a highway under this Act may not prohibit the use of diesel-powered vehicles, machinery or equipment in the said works, or operate a policy that prioritises the use of electric, HVO or hydrogen powered equipment and machinery, or which prohibits the use of diesel vehicles, unless they can demonstrate a compelling value for money and efficiency case to the ORR.”— (Greg Smith.) This new clause would prevent licence holders from prioritising electric, HVO and hydrogen powered equipment and machinery, or ban diesel vehicles without evidence that this would be more efficient and better value for money. Brought up, and read the First time.
Greg Smith (Mid Buckinghamshire) (Con)
I beg to move, That the clause be read a Second time. It is a pleasure to serve under your chairmanship, Mr Wishart. New clause 4, tabled in my name and that of my hon. Friend the Member for Bognor Regis and Littlehampton, is intended to get some sense into a point that we debated in relation to some of the earlier clauses and amendments. We also took considerable evidence on it during the oral evidence sessions. The point is to get to the nub of the value-for-money test: the test of the cost to the ultimate toll payer for the construction of any new highways under the provisions of the Bill. I mean of course the means by which construction plant are fuelled or powered. I understand that there are some who wish to see the entire world electrified and other means of fuel put in our construction plant, in the laudable and noble aim of environmental and green factors. But the reality is that none of that is cheap and none of it offers value to the ultimate toll payer in this case, or in other applications, the taxpayer or other users. The presumption, for example, to use hydrotreated vegetable oil as a transitionary sustainable fuel adds between 15p and 20p to a litre price. That is significant when it comes to the overall requirement for fuel for construction plant going forwards, and that is before we get into the debate about battery electric plant. In most cases, that plainly does not exist; lithium ion becomes very unstable under intense vibration, which is why most construction plant cannot use it in the first place. It is why we have seen many companies in this country looking to different modes of powering construction plant, probably the most famous being the development of hydrogen combustion for this sort of plant. But it comes back to the base point I made earlier: it is exceptionally expensive. It blows the budget when it comes to trying to use this equipment, because it is just not mature enough in its development and it has not been refined in the way that those pieces of construction plant that operate on the internal combustion engine have been so far. What new clause 4 seeks to do is really very straightforward. It would stop licence holders banning diesel plant or prioritising electric, hydrotreated vegetable oil or hydrogen plant unless they can show the ORR compelling value for money and efficiency. That is a key test. When we took oral evidence on this issue, the representative from National Highways essentially said that it does not bother putting to market the different modes of fuelling construction plant; it just accepts whatever the industry puts forward. But the industry is operating under a set of rules that basically says it has to look to things like HVO, and from an economic standpoint that is pure madness right now. New clause 4 simply seeks to put that duty not to ban things, but to prove the economic viability, the test, to the ultimate toll payer under these licences in the long term.
forNC4

Alternative construction fuels such as HVO, battery electric and hydrogen are substantially more expensive and technically immature for construction plant, so mandating or prioritising them would raise costs passed on to toll payers.

forNC4

National Highways does not test the market across different fuel and power options and simply accepts what industry proposes, so the clause would require licence holders to prove value for money before restricting fuel choices.

Douglas Lumsden (Aberdeen South) (Con)
In this new clause, we are talking about not just the construction of any highway but its maintenance. I am thinking about gritters, for example. We should not mandate that they need to be on HVO, electric or anything else.
forNC4

The clause should also cover maintenance, since mandating HVO or electric power for vehicles such as gritters would be impractical and should not be required.

Greg Smith
My hon. Friend makes a very good point. There are large parts of the haulage sector, for example, that have voluntarily moved on to HVO power on the grounds that electric is just unaffordable and in parts impractical for the heavier payloads. A gritter starting the night fully laden is a vehicle that would not get very far on a battery and HVO would be more expensive. But new clause 4 is much more about the construction phase of any new highway. I do not want to re-litigate the points I have made time and again in this Committee, but if the Government are serious about delivering schemes under the Bill that genuinely have value and affordability to the ultimate toll payer, I cannot think of a single argument why new clause 4 would not be adopted and those who get the licences in the regulatory orbit of the ORR would not wish to minimise the cost of construction via every means possible, and therefore deliver the lowest possible toll for users of the lower Thames crossing or any other scheme built under it.
forNC4

Haulage has voluntarily moved to HVO but electric is unaffordable for heavy loads; the clause would ensure licence holders minimise construction costs and therefore the eventual toll.

Alison Griffiths (Bognor Regis and Littlehampton) (Con)
Does my hon. Friend agree that the Government are placing a far higher burden on contractors in the Bill than they are on any other part of the country in wider legislation?
againstthe Bill

The Bill places a considerably heavier burden on contractors than wider legislation applies elsewhere in the country.

Greg Smith
Without new clause 4, my hon. Friend would be absolutely right. New clause 4 would be the safeguard against that. I say this as someone who is actually a huge fan of advanced sustainable fuels, synthetic fuels and other ways of keeping the internal combustion engine alive. I am genuinely excited about the British innovation that goes into these technologies. I think they will be the way that our vehicles, construction plant, road haulage and agricultural vehicles are powered in the future. I think it is the technology that may well be the VHS that wins against the battery electric Betamax. However, right here, right now, it is about cost. These alternative forms of construction are more expensive and the Government should rule them out.
forNC4

Although supportive of advanced sustainable and synthetic fuels in the long term, current alternatives are too expensive, so the Government should rule them out for construction now.

Justin Madders
I am grateful to the shadow Minister for raising this issue once again. He is clearly very exercised by the issue, but I refer the Committee to the actual evidence we heard from the chief executive of the project on the lower Thames crossing. There were various references to this not having any impact on the overall cost.
againstNC4

Evidence from the lower Thames Crossing chief executive indicated that fuel and technology requirements had no effect on overall construction cost, so the clause is not needed.

Alison Griffiths
I apologise if I am about to ask a question that the Minister was on the verge of answering, but my understanding from the evidence session was that we heard the lower Thames crossing had not considered any other fuel. I therefore do not think that is completely accurate.
forNC4

Oral evidence suggested the lower Thames Crossing had not considered other fuels, so the Minister's account of the evidence is not fully accurate.

↳ responds to Justin Madders: “Evidence from the lower Thames Crossing chief executive indicated that fuel and technology requirements had no effect on overall construction cost, so the clause is not needed.” jump to it ↑
Justin Madders
I am about to address the hon. Lady’s point. Let me explain exactly what happened. The construction carbon limit for the lower Thames crossing and the carbon-neutral requirement were included in the development consent order, which I think the shadow Minister is now saying is “pure madness”. He is again traducing his own party’s reputation in government. That is fine—he is entitled to do that, and it saves us a job. The order did not specify any particular type of fuel. The evidence we heard from Matt Palmer, the chief executive of the lower Thames crossing, is that about two thirds of contractors were coming forward with HVO as their proposal, rather than saying, “We’re mandated to procure a particular type of fuel.” That is what the market was delivering, and those requirements are there to ensure that the lower Thames crossing is consistent with national carbon budgeting during the construction period. Across the project’s three delivery partners, carbon formed part of the tender evaluation criteria, and tenders were required to meet or exceed a carbon reduction target. The successful delivery partners met or exceeded that requirement without increasing overall construction costs. The tenderers that submitted the lowest-cost bids also had the lowest carbon from construction. As I say, National Highways did not prescribe individual technologies or fuels that delivery partners should use, which is effectively what the new clause would do.
againstNC4

The development consent order did not specify any fuel type; most contractors proposed HVO voluntarily, and National Highways did not prescribe technologies, which the clause would effectively do.

↳ responds to Greg Smith (Mid Buckinghamshire) (Con): “National Highways does not test the market across different fuel and power options and simply accepts what industry proposes, so the clause would require licence holders to prove value for money before restricting fuel choices.” jump to it ↑
againstNC4

Carbon reduction was a tender evaluation criterion; successful bidders met the target without raising overall costs, and the lowest-cost bids also had the lowest construction carbon.

↳ responds to Greg Smith (Mid Buckinghamshire) (Con): “Alternative construction fuels such as HVO, battery electric and hydrogen are substantially more expensive and technically immature for construction plant, so mandating or prioritising them would raise costs passed on to toll payers.” jump to it ↑
Mike Reader (Northampton South) (Lab)
I am trying to understand the premise of the new clause, because what is really important for construction businesses is certainty. Given the volatility that we have seen in the diesel market, HVO and electricity generated from hydrogen—by British hydrogen businesses based out of Newark—give construction companies certainty of cost over the long term, which enables them to borrow more cheaply and deliver lower costs. Why do the Conservatives want to push up costs and make it riskier for construction businesses to deliver projects such as the lower Thames crossing?
againstNC4

HVO and hydrogen-derived electricity give construction firms cost certainty amid diesel price volatility, so restricting them would raise costs and risk for construction businesses.

↳ responds to Greg Smith (Mid Buckinghamshire) (Con): “Alternative construction fuels such as HVO, battery electric and hydrogen are substantially more expensive and technically immature for construction plant, so mandating or prioritising them would raise costs passed on to toll payers.” jump to it ↑
Justin Madders
That is probably a question for the shadow Minister, but I can answer for him and say that the Conservatives have absolutely no idea how to run a big construction project, as their 14 years in government showed. The point is that setting it up in this way has allowed delivery partners flexibility and encouraged innovation in how carbon reduction could most effectively and efficiently be achieved. For a long time, a significant proportion of the construction industry has included the use of alternative fuels in its bids as part of its own net zero plans. The new clause is not appropriate: it imposes a level of prescription that is not necessary in what is a framework Bill about a financial model, and it is, of course, based on a completely false premise.
againstNC4

The clause is over-prescriptive for a framework Bill about financial models, and its premise is mistaken because much of the industry already includes alternative fuels in bids as part of net zero plans.

Tristan Osborne (Chatham and Aylesford) (Lab)
I do not know whether the Minister is aware, but during the last energy crisis, the previous Government had the opportunity to change His Majesty’s Revenue and Customs excise notice 75, which looks at red diesel pricing. They allowed a certain number of opt-outs for a number of sectors, but not for construction and others. That could have been done, but the industry has since changed and adapted to the use of HVO, so going back would seem counterintuitive. My question for the Minister is this: why was that not proposed in previous energy crises?
againstNC4

The industry has adapted to using HVO, so reverting towards diesel, as might have been done through red diesel tax changes, would be counterintuitive.

Justin Madders
Again, an hon. Friend tempts me to answer for the previous Government’s failings, but I do not need to do that. I think my hon. Friend’s question answers itself. It is simply not appropriate for the Bill to make exact provisions about how future licence holders choose to procure for construction and maintenance. It really is not the way to do it, and I therefore ask the hon. Member for Mid Buckinghamshire to withdraw his new clause.
againstNC4

It is not appropriate for the Bill to set out detailed provisions on how future licence holders procure fuel for construction and maintenance.

Greg Smith
I have heard the points that the Minister has made. On some of the taunts he makes towards me, if he looks back through the Official Re p or t , he may find a consistency there, certainly from me, because I was making some of the same points when we were in government. There is a simple, unavoidable point in this debate. White diesel—I accept the points that the hon. Member for Chatham and Aylesford makes about red diesel—is cheaper than HVO. It always has been. The hon. Member for Northampton South is right that it is a more volatile market, but it has always been, and still is, cheaper—by about 10% to 15% at the moment—than HVO, and that is before we start getting into other fuel types, of which, I repeat, I am a huge fan. It is therefore simply implausible to argue that right now forcing construction down a route of using anything other than white diesel in the construction plant would result in anything other than a significant cost implication for the whole project. The Opposition shall, therefore, push new clause 4 to a Division. We feel that it is an important point to make for value to the ultimate toll payer. Question put, That the clause be read a Second time. New Clause 5 Report on the comparative regulatory functions of the ORR in respect of roads and railways “(1) The Secretary of State must, within six months of the passing of this Act, publish a report comparing— (a) the regulatory functions and powers conferred on the ORR under this Act; (b) the regulatory functions and powers exercised by the ORR in relation to the railway network, including its proposed role in relation to Great British Railways; and (c) the extent of the ORR's independence from the Secretary of State in exercising its functions in relation to highways and railways respectively. (2) The report under subsection (1) must explain the reasons for any differences in the regulatory arrangements for highways and railways.”— (Greg Smith.) This new clause would require the Secretary of State to publish a report setting out the differences between the regulatory functions given to the ORR for road and rail and the reasons for these differences. Brought up, and read the First time.
forNC4

White diesel remains around 10-15% cheaper than HVO, and while the market is volatile, forcing construction away from white diesel would have a significant cost implication for the project.

↳ responds to Mike Reader (Northampton South) (Lab): “HVO and hydrogen-derived electricity give construction firms cost certainty amid diesel price volatility, so restricting them would raise costs and risk for construction businesses.” jump to it ↑
Greg Smith
I beg to move, That the clause be read a Second time. New clause 5, tabled in my name and that of my hon. Friend the Member for Bognor Regis and Littlehampton, would require the Secretary of State to publish a report setting out the differences between the regulatory functions given to the Office of Rail and Road for road and rail separately, and the reasons for those differences. We have teased this argument out previously in Committee, including in the oral evidence sessions. How is it that in the Railways Bill, the Government seek to play down the ORR, diminish its power base—if I can call it that—and essentially brush it to one side in the rail industry, and yet for road the ORR appears to be the champion of everything and is being given such incredible new regulatory power under this Bill? Will the Minister—I accept that he is the Roads Minister, not the Rail Minister, but we were promised joined-up Government—explain why there is such disparity in those regulatory arrangements? That is important, because we are asking the public, the ultimate users of highways built under licences provided for in the Bill, to trust the regulatory regime that sits over and guides those licences, and produces all the guidance that we are told we must wait to see until after the Bill receives Royal Assent. It is a question of trust. If we are being asked to trust the ORR so much on highways, the Government surely have a duty to answer why they themselves trust the ORR less on the rail sector. I ask the Minister: how much direction can the Secretary of State really give the ORR on roads, given that diminution when it comes to rail? That is not a complicated question, but it will raise many eyebrows in the transport sector at large. It will keep the sector guessing for many years to come—whenever the Government come up with another innovation relating to roads or in the railway sector—about exactly where the role of the Office of Rail and Road will sit. That disparity does not make sense to the official Opposition. We therefore tabled new clause 5 to get a report, within six months of Royal Assent, comparing the ORR’s functions and independence on highways with its functions and independence on railways.
forNC5

The Government is weakening the ORR's role in rail while strengthening it for roads, which raises trust concerns; a report comparing the two regimes and explaining the differences is needed.

Olly Glover (Didcot and Wantage) (LD)
It is a pleasure to serve under your chairship on this Committee for the final time, Mr Wishart. New clause 5 is a remarkably sensible amendment from the shadow Minister—I have not always felt able to say similar during these proceedings. The hon. Member for Mid Buckinghamshire raises a very good point: the Government are taking a totally inconsistent approach to the role of the Office of Rail and Road. This Bill is strengthening its role to ensure that things work sensibly and appropriately in relation to private toll roads, but for the railway the Government have significantly denuded the ORR’s powers, presumably because Great British Railways will eventually do more than display a livery of rather dubious, garish colours. I hope the Minister can explain the logic for why the ORR is being treated so differently in those two sectors.
forNC5

The Government takes an inconsistent approach to the ORR, strengthening its role for private toll roads while significantly reducing its powers for railways; the Minister should explain the logic.

Justin Madders
It is wonderful to hear the shadow Minister being such a champion for regulation. That is not something that we have been treated to previously, but we are delighted to hear that he has come onboard, if the Committee will pardon the pun. In October last year, the Government announced that we were commissioning Dr Richard Judge to undertake an independent review of the Office of Rail and Road, in relation to the significant changes being made in the rail sector, to which both Opposition spokespeople—the hon. Member for Mid Buckinghamshire and the hon. Member for Didcot and Wantage—referred. The Government felt it would be helpful to get ahead of that change with an independent review to help to ensure that the regulator is well placed to deliver the transformation, and to oversee organisational change in the rail sector while continuing to deliver its other roles and functions effectively, particularly those that relate to roads. The review was also intended to allow the development of key learning and insights to support performance improvements for other regulators. Dr Judge spent nearly a year doing the review and published his findings very recently, in September, with 12 recommendations. The review considered the role of the ORR in both rail and road and the Government are, of course, considering those recommendations. We will publish our response in due course. As the Committee would expect me to say, asking for another report on the duties of the ORR in a slightly different format would not be the best use of taxpayers’ money. The shadow Minister says that his central question—why we are treating rail and road differently—is not complicated, and it does not have a complicated answer. Rail and road are, of course, different modes of transport and therefore require different types of regulatory oversight. One reason for the change in the ORR’s role in rail is that, of course, many passenger services are moving into the public sector whereas, under this Bill, road will move into the private sector for the first time. Rail also runs differently to road, and has different risks and opportunities. Rail is a closed system, by which I mean people cannot turn up in their own locomotive and get on the tracks, whereas anyone can get in a vehicle and use a road. The rail operator is therefore responsible for every passenger on the train, but a member of the public can drive on the road whenever they wish and the road operator is not responsible in the same way. Those are fundamental and obvious differences, which is why the answer to why we are treating them differently is not complicated. They are entering into new regimes: one is clearly far more involved in the public sector, as it is far more related to passenger services, and the other is not. In simple terms, that is why they are being treated differently.
againstNC5

An independent review of the ORR by Dr Richard Judge has already been completed and its recommendations are under consideration, so a further report would be poor use of public money.

↳ responds to Greg Smith: “The Government is weakening the ORR's role in rail while strengthening it for roads, which raises trust concerns; a report comparing the two regimes and explaining the differences is needed.” jump to it ↑
againstNC5

Rail and road are fundamentally different: passenger services are moving into the public sector while roads are moving into the private sector, and a rail network is a closed system whereas anyone can drive on a road, justifying different regulatory approaches.

↳ responds to Olly Glover (Didcot and Wantage) (LD): “The Government takes an inconsistent approach to the ORR, strengthening its role for private toll roads while significantly reducing its powers for railways; the Minister should explain the logic.” jump to it ↑
Greg Smith
That was a noble effort from the Minister to defend another wing of his Department, but a lot of questions are still to be answered. There are a lot of unknowns around the Government’s real attitude towards the ORR, not least because with the railways, although the Government are not particularly keen on it anymore, there is open access and competition. In the private road space, there have been private roads for which a toll has been charged before—we have named multiple, including the Mersey tunnel and the M6 toll, during the Committee’s consideration. We felt that it was important to put down a marker during the passage of the Bill to encourage the Government to be more joined up and to take a better approach to the ORR. However, on new clause 5 in particular, I am happy to confirm that we believe that the point has now been made. I beg to ask leave to withdraw the motion. Clause, by leave, withdrawn. New Clause 6 Support for small businesses and charities affected by roadworks “(1) This section applies where a person has been licensed to charge tolls under section 3 of this Act in return for securing works specified in the licence. (2) The licencing authority must make provision for a proportion of toll revenue raised by the licence holder to be used for the purposes of providing— (a) financial compensation, or (b) equivalent support, to any small business or charitable organisation that has incurred a detriment as a result of the undertaking of the works specified in the licence. (3) This section applies where— (a) such roadworks or closures have lasted, or are expected to last, for a period of six months or more, and (b) any small business or charitable organisation suffers a material financial, access or other detriment resulting from the roadworks or closures.”— (Zöe Franklin.) This new clause would introduce compensation for charities and small businesses when impacted by any medium to long-term infrastructure works resulting from this Act. Brought up, and read the First time .
forNC5

The Government's attitude towards the ORR remains unclear, given that rail has open access and competition while tolled private roads such as the Mersey Tunnel and M6 Toll already exist; the point was made as a marker and the clause is withdrawn.

↳ responds to Justin Madders: “Rail and road are fundamentally different: passenger services are moving into the public sector while roads are moving into the private sector, and a rail network is a closed system whereas anyone can drive on a road, justifying different regulatory approaches.” jump to it ↑
Zöe Franklin (Guildford) (LD)
I beg to move, That the clause be read a Second time. It is a pleasure to serve under your chairmanship, Mr Wishart. New clause 6 would provide support for small businesses and charities suffering material harm due to prolonged roadworks associated with schemes licensed under the Bill. Infrastructure investment is, of course, essential, but we must recognise the costs forced on to neighbouring businesses and communities during construction. In my constituency, the works between junction 10 of the M25 and the A3 have demonstrated the exact consequences of such prolonged disruption. Closures and diversions have restricted access, causing substantial losses for local businesses and charitable organisations. That has included RHS Wisley, which, it has been documented, has since received some compensation for the many millions of pounds it lost over the course of the project. For a small business, months of falling trade can threaten its survival, as rent, wages and utility bills still need to be paid. For a charity, lost income can mean reductions in the services on which people depend, and in the many additional provisions it gives the local community. New clause 6 would require the licensing the authority to make provision for a proportion of toll revenue to be used for compensation or equivalent support when works last, or are expected to last, at least six months and cause material, financial, access or other detriment. That threshold would focus support on sustained disruption, while allowing it to be planned form the outset. The inclusion of “equivalent support” would also provide flexibility to address different organisational needs, so that support does not always have to be financial. Could the Minister explain what protections the Bill currently offers for affected businesses and charities, and how support could reach them during construction, when it is needed most? The businesses and charities enduring disruption must have a fair chance of surviving, to share the benefits of the investment that they are being disrupted by. I look forward to hearing the Minister’s response.
forNC6

Prolonged roadworks, such as those between the M25 junction 10 and the A3, cause serious financial losses to local businesses and charities, which can threaten their survival, so support should be provided.

Greg Smith
I have enormous sympathy with new clause 6. As Members may have heard me reference on many occasions over the last seven years, my Buckinghamshire constituency has seen a lot of significant infrastructure works, including a railway we did want, in East West Rail, and one we did not, in HS2. The construction of both of those had significant impacts on local communities. Under the Bill, construction of any road built under licence would undoubtedly have a similar impact on businesses, charities and, frankly, public services, including hospitals, GP services, libraries and schools, just as the hon. Lady has seen in her constituency. There is a good argument to be made that those who have to bear the brunt of those infrastructure works should at the very least receive due compensation. I can remember what happened to the Prince of Wales pub in a village called Steeple Claydon in my constituency when HS2 and East West Rail had, between them, shut off three of the four roads in and out of the village. The pub—a wet-led pub with no food—was down some £60,000 in turnover over those four or five months. What was it offered in return? Absolutely nothing. That cannot be an acceptable way forward. I gently take issue with the restriction to just charities and small businesses in new clause 6. Charities and small businesses are fantastic, wonderful and marvellous things that should not be negatively impacted by a decision made by the state or anyone else, but so are many other organisations in our communities. In the spirit of reaching out with an olive branch, I hope that the new clause can be improved for future rounds of this Bill, when we return to the Chamber on Report or when it goes to the other place, to recognise a much broader scope of institutions. If the supply chains of medium-sized businesses or even large businesses are completely cut off, it is not reasonable that they should just suck up a cost that is not their fault and impacts their businesses so much. That is also the case for the other institutions I have spoken about. The point in principle is sound and good, and I urge the Minister to look at it very carefully. I cannot believe that he or any member of the Government wants to see our charities, businesses and other institutions impacted negatively by infrastructure construction under this Bill or anything else. My constituency has experienced it, and the constituency of the hon. Member for Guildford clearly has too, and I hope that we can move forward and find a way to recognise that.
forNC6

Those who bear the burden of major infrastructure works, such as businesses affected in his constituency by HS2 and East West Rail, should receive due compensation, and the principle of the clause is sound.

forNC6

The clause's scope is too narrow because it covers only charities and small businesses; it should be broadened to other organisations such as public services and medium and large businesses in affected supply chains.

Justin Madders
The hon. Members for Mid Buckinghamshire and for Guildford have both expressed some sympathy for businesses experiencing disruption from roadworks. I think that we can all appreciate that. Unfortunately, the new clause would have some difficulty working in practice. For example, what constitutes a small business? The shadow Minister will remember our conversations about his attempts to redefine a small business. Is it as defined in the Small Business, Enterprise and Employment Act 2015, or is it another definition? Does it include the supply chain as well? I think the shadow Minister would say that it should include all businesses. There is also a lack of clarity about what material detriment means and how we would define local. This is about roads, so it could be anywhere in the country. How do we show that detriment? Who gets to make the final decision? Is there an appeal mechanism? Who gets to decide whether someone has been materially affected by the licence holder, and what happens if the licence holder does not agree? There is no process set out here, and I am afraid that there is a lack of definition. I accept that the new clause is tabled with good intentions, but it does not pass the test for legislation. It is worth pointing out that the original planning consents will have provisions for compensation for disruption during the construction phase, and that the stakeholder group will be able to reflect views from users of the highway and others with an interest in it. I am sure that they would want to discuss roadworks and reducing the impact for everyone. The fundamental point is that the licence holder is, by definition, incentivised to minimise disruption as much as possible, because they will want to maximise their revenue and be confident that people will use their roads swiftly and efficiently. It is therefore not in their interest to have long periods of six months, or even six weeks, of roadworks that would act as a disincentive to use that particular highway. I therefore do not think that the new clause passes the test of what we are looking for, although I appreciate the good intentions behind it.
againstNC6

The clause is not workable as drafted because key terms such as small business, material detriment and local are undefined, and there is no process for deciding claims or appeals.

↳ responds to Zöe Franklin (Guildford) (LD): “Prolonged roadworks, such as those between the M25 junction 10 and the A3, cause serious financial losses to local businesses and charities, which can threaten their survival, so support should be provided.” jump to it ↑
againstNC6

Compensation for construction disruption is already provided in original planning consents, the stakeholder group can address roadworks concerns, and licence holders are financially incentivised to minimise disruption.

↳ responds to Zöe Franklin (Guildford) (LD): “Prolonged roadworks, such as those between the M25 junction 10 and the A3, cause serious financial losses to local businesses and charities, which can threaten their survival, so support should be provided.” jump to it ↑
Zöe Franklin
I thank the Minister for his response and the hon. Member for Mid Buckinghamshire for his enthusiastic support, albeit with caveats. I am interested to hear the Minister’s comments, particularly his final point about how minimising disruption should be an incentive for anybody taking on such an infrastructure project. Having experienced the works between the A3 and junction 10 of the M25—which were extended considerably, due to the joys of the British weather and many other challenges—I admire his optimism. Of course those implementing significant infrastructure improvements would like to finish quickly, but the reality is that they often do not, which has serious implications for businesses, charities and others, as has been mentioned. The Minister outlined quite a significant list of questions that he has, but if those are the key concerns, and if he agrees with me and the hon. Member for Mid Buckinghamshire in principle, then I suggest he work with me at the next stage of the Bill. It is clear that we have the appetite to support small businesses, other organisations and charities to help to minimise disruption and the financial challenges. I would like to the push the new clause to a vote, but I thank the Minister for his thoughts so far. Question put , That the clause be read a Second time. Clause 98 Interpretation of Act Question proposed, That the clause stand part of the Bill.
forNC6

Infrastructure projects often overrun, so the incentive to minimise disruption does not reliably prevent serious harm to businesses and charities; the Minister should work on the clause at the next stage.

↳ responds to Justin Madders: “Compensation for construction disruption is already provided in original planning consents, the stakeholder group can address roadworks concerns, and licence holders are financially incentivised to minimise disruption.” jump to it ↑
The Chair
With this it will be convenient to discuss clauses 99 to 104 stand part.
Justin Madders
I will not detain the Committee; these are the standard clauses that we are all familiar with and love so much. Clause 98 defines various terms used throughout the Bill; it is a standard interpretation clause. Clause 99 allows for consequential provision to be made by regulations where required. Again, this is standard provision found in most Bills. Clause 100 sets out provisions about regulations under the Bill. Regulations may include consequential, supplementary, incidental, transitional or saving provision, and may make different provision for different purposes. The clause also sets out the appropriate level of parliamentary scrutiny that applies. Clause 101 provides that the tolling provisions in parts 3 and 7 apply to Crown servants and Government vehicles in the same way as they apply to other people and vehicles. Clause 102 sets out the territorial extent of the Bill. Clause 103 sets out when the Bill’s provisions will come into force: part 8 comes into force on Royal Assent, while the remaining provisions will commence as set out in this clause. Finally, clause 104 provides that the Bill, once enacted, may be cited as the Highways (Financing) Act 2026. Question put and agreed to. Clause 98 accordingly ordered to stand part of the Bill. Clause 99 ordered to stand part of the Bill. Clause 100 Regulations Amendment proposed : 59, in clause 100, page 66, line 32, at end insert— “(f) regulations under section 27(1) (enforcement of tolls: penalty charges)”.— (Greg Smith.) This amendment would ensure that regulations about penalty charges were subject to the affirmative procedure. Question put , That the amendment be made. Clauses 100 to 102 ordered to stand part of the Bill. Clause 103 Commencement Amendment proposed : 69, in clause 103, page 67, line 18, leave out lines 18 to 21 and insert “after the ORR has published its code relating to the charging of tolls under section 26.”— (Greg Smith.) This amendment would prevent the Act from coming into force until the ORR has published its code relating to the charging of tolls. Question put , That the amendment be made. Amendment proposed : 74, in clause 103, page 67, line 18, leave out lines 18 to 21 and insert “after the Secretary of State has published guidance about how the powers in section 29 and section 30 will be exercised by licence holders.”— (Greg Smith.) This amendment would prevent the Act from coming into force until the Secretary of State has published guidance about the exercise of the powers in sections 29 and 30 of this Act. Question put, That the amendment be made. Clauses 103 and 104 ordered to stand part of the Bill. Question proposed, That the Chair do report the Bill, as amended, to the House.
Justin Madders
I want to take the opportunity to thank you, Mr Wishart, for your excellent chairing, and the other Chairs, Mr Dowd and Ms Lewell. We did not need Mr Pritchard, but the will was there. If the Committee proceedings are a sign of the speed and efficiency at which the network will operate, that is a good thing. I thank members of the Committee for participating and assisting with the debate in good humour and in a constructive way. I thank the Clerks, the Doorkeepers and, of course, my officials. There are matters that we may return to on Report, but I put on record my appreciation to everyone in the Committee Room today and to those who have been present previously for making sure that we get our business transacted.
Greg Smith
I echo the thanks to you, Mr Wishart, and the other Chairs of this Committee over the last couple of weeks, and to the Clerks of the House, the Doorkeepers, and all Members. We have had perhaps not as lively a debate as I have been used to as a shadow Minister in Bill Committees, but I do not think anything will ever get close to the Bill Committee of what is now the Employment Rights Act 2025. These Bill Committees are where we can genuinely scrutinise legislation, in an era where Second Reading in the House can often be very short, and where Report and Third Reading can be compressed too. It is a shame that the Government have not accepted a single amendment either from the Conservatives or the Liberal Democrats. Some of them were eminently reasonable and would have strengthened a Bill that, as I have said many times, we support the fundamental premise of, but we have had a good debate. I thank all those involved, particularly those who are not members of the Committee but have made it possible and allowed it to run so smoothly.
forthe Bill

The Opposition supports the fundamental premise of the Bill, but regrets that the Government accepted none of the Conservative or Liberal Democrat amendments, which it argues would have strengthened the Bill.

The Chair
On that note, I think everybody on the Committee and the Clerks are very grateful to the Minister and the shadow Minister. Question put and agreed to. Bill, as amended, accordingly to be reported. Committee rose.