Scheme-agnostic and future-proof scope
On the Bill as a whole
For (4)
Justin Madders argues that National Highways' evidence shows no overall cost increase from the fuel requirement, that it was set in the 2022 development consent order, and that the Bill is scheme-agnostic so such restrictions do not belong in it.
Justin Madders argues that the Bill is scheme-agnostic, so a fuel-type requirement would not help and does not belong in the legislation.
Schedule 2 applies a familiar Insolvency Act framework, adapted to the highways objective and to companies incorporated outside Great Britain.
Justin Madders responds that the equipment will mainly be number plates and roadside cameras, and that broad terminology is kept to allow for future technology.
Against (2)
Thomas McLennan argues that a consistent national framework is needed across charging schemes, since different schemes with their own rules create friction for fleets and motorists.
Scheme-specific variations cannot be set out more precisely in a scheme-agnostic framework, and tolling safeguards already exist in clause 7; a precise toll cannot be set in legislation.
On specific amendments
46 Conservative
For (0)
None.
Against (1)
Naming a single project would undermine the aim of a general framework for future major road schemes, and would unduly constrain future Governments.
81 Conservative
For (0)
None.
Against (1)
Future local government structures cannot be predicted, so hardwiring named authorities would not future-proof the legislation. The existing consultation power is more flexible.
51 Conservative
For (0)
None.
Against (1)
The Bill should remain technology-neutral because future vehicles or number plates may differ, and the power to specify equipment, as used with smart tags at Dartford and the Mersey tunnels, provides flexibility.
83 Conservative
For (1)
Greg Smith argues that tolling rules should be consistent across roads, that the registered-keeper default does not reflect the reality of leasing, and that the Government should respond to leasing industry evidence and provide assurance against disproportionate recharge fees.
Against (0)
None.