Data centres
Within Critical infrastructure and sectors
· Scoped to this sitting (Lords, 1 September 2026) —
see across the whole Bill →
2 for · 1 against
Total across everything below — "on the Bill as a whole" and every amendment group combined. See each
section's own figures for what "for"/"against" means there specifically.
On specific amendments
"For"/"against" here means for or against that amendment passing — not the bill.
An amendment can itself cut either way (e.g. one that deletes a clause), so check
what the amendment does before reading the stance as pro- or anti-bill.
3
— Withdrawn
Crossbench
The amendment seeks to add a risk-based designation criterion alongside the existing megawatt thresholds for operators of essential services.
For (2)
for3
Baroness Kidron (CB)
Smaller data centres below the megawatt threshold can pose serious risks to customers, as shown by a Danish ransomware attack, so Ofcom should be able to designate them on risk grounds.
for3
Lord Clement-Jones (LD)
Rigid megawatt thresholds are a crude proxy for risk; a dense, interconnected facility under the threshold could host critical patient or emergency data, so a risk-based designation is needed.
Against (1)
against3
Baroness Lloyd of Effra (Lab)
The significance of a data centre is not determined by size alone, but Ofcom already has powers to gather information and designate smaller facilities where appropriate, so a new criterion is unnecessary.