Stage: Committee stage · Decision: Withdrawn · Clause 4 · Crossbench

What it would do

The amendment seeks to add a risk-based designation criterion alongside the existing megawatt thresholds for operators of essential services.

Show the amendment's own text

Clause 4, page 3, line 18, at end insert—

“(3A) A data centre also meets the threshold requirement in this paragraph, regardless of its rated IT load, if the Office of Communications considers that an incident affecting the data centre would be likely to have a significant impact on the economy or the day-to-day functioning of society in the United Kingdom or any part of it, having regard in particular to the data centre’s customer base and level of interconnection with essential services.”

Show the Bill text this amendment would change (Clause 4: Data centres to be regulated as essential services, as it stood in HL Bill 32 (as brought from the Commons))

(1) The NIS Regulations are amended as follows.

(2) In the table in Schedule 1 (designated competent authorities), after the entry relating to digital infrastructure insert—.

(3) In Schedule 2 (essential services and threshold requirements), after paragraph 10 insert—

The data infrastructure subsector

(1) This paragraph describes the threshold requirements which apply to specified kinds of essential services in the data infrastructure subsector.

(2) For the essential service of the provision of a data centre service in the United Kingdom, otherwise than on an enterprise basis, the threshold requirement is that the rated IT load of the data centre is equal to or greater than 1 megawatt.

(3) For the essential service of the provision of a data centre service in the United Kingdom on an enterprise basis, the threshold requirement is that the rated IT load of the data centre is equal to or greater than 10 megawatts.

(4) “Data centre service” means a service consisting of the provision of a physical structure (a “data centre”) which—

(a) contains an area for the housing, connection and operation of relevant IT equipment, and

(b) provides supporting infrastructure for or in connection with the operation of relevant IT equipment.

(5) “Relevant IT equipment” means equipment used for the purposes of providing information technology services.

(6) “Supporting infrastructure” means one or more of the following—

(a) infrastructure for the supply of electricity;

(b) infrastructure for environmental control;

(c) infrastructure to ensure the security of the data centre and of relevant IT equipment in the data centre;

(d) infrastructure to ensure the resilience of the data centre and of relevant IT equipment in the data centre.

(7) A data centre service is provided on an enterprise basis if—

(a) the data centre is owned or managed by a person in connection with the carrying on of an undertaking by the person, and

(b) the sole purpose of the data centre is to provide information technology services for that undertaking.

(8) In this paragraph—

(a) “environmental control” includes heating, ventilation, air conditioning and control of matters such as airborne dust, humidity and flames;

(b) the “rated IT load” of a data centre is the maximum electrical power available for the operation of relevant IT equipment housed in the data centre;

(c) “structure” includes a building or part of a building, and references to a structure include references to a group of structures.

View the full Bill text on the UK Parliament website →

Sponsors

Baroness Kidron Crossbench, Baroness Harding of Winscombe Conservative, Baroness Berger Labour, Baroness Morgan of Cotes Non-affiliated

How members argued on this amendment, by party
No party data
3 for · 1 against (n=4)

Arguments made about this amendment

For (3)

for3 Baroness Kidron (CB)

Smaller data centres below the megawatt threshold can pose serious risks to customers, as shown by a Danish ransomware attack, so Ofcom should be able to designate them on risk grounds.

for3 Baroness Harding of Winscombe (Con)

Small providers can be a risky network node, as telecoms experience showed, so the size exemptions should be removed for those posing risk.

for3 Lord Clement-Jones (LD)

Rigid megawatt thresholds are a crude proxy for risk; a dense, interconnected facility under the threshold could host critical patient or emergency data, so a risk-based designation is needed.

Against (1)

against3 Baroness Lloyd of Effra (Lab)

The significance of a data centre is not determined by size alone, but Ofcom already has powers to gather information and designate smaller facilities where appropriate, so a new criterion is unnecessary.

1 more, flagged as likely about a different amendment (not counted above)
for3 Baroness Kidron (CB)

A similar risk-based designation route should apply to managed service providers, so that the ICO can bring in small providers that pose a risk.

⚠ Likely a misspoken number in the chamber — Speaker says Amendment 3 would provide similar risk-based designation for relevant managed service providers; the grounding facts give Amendment 3 as a data-centre megawatt-threshold criterion, and the RMSP size-threshold amendment is Amendment 13.