Litigation and time limits
On the Bill as a whole
For (3)
Clause 87 ensures leaseholders in single-dwelling buildings are not excluded from construction product liability redress, and clause 88 clarifies limitation periods for related claims.
Clauses 89 to 94 disapply limitation periods for remediation and related orders because defects surface decades later, and protect remediation contribution funds in trusts so they cannot be diverted to creditors.
Disapplying limitation periods to remediation and building liability orders ensures remediation is not delayed by time limits that could expire before defects are discovered.
Against (2)
The Bill does not commit the Government to making manufacturers of unsafe products pay, leaving residents to pursue them through slow and costly litigation.
Dame Judith Hackitt argues the Bill does not yet give residents certainty, because uncertainty about what needs doing and by whom still leaves room for legal debate.
On specific amendments
45 Conservative
For (2)
Costs notices can impose millions of pounds of liability on connected persons, so they should be able to challenge them on error of law, irrationality or disproportionality.
The existing protection is not considered sufficient, which is why the amendment is proposed.
Against (0)
None.
15 Liberal Democrat
For (1)
Enforcement is often the real cause of delay; fines only deter if enforcement is properly funded, otherwise residents face lengthy legal action.
Against (0)
None.