Stage: Committee stage · Decision: Agreed · Clause 6 · Labour

What it would do

This amendment would ensure that the threshold requirement relating to the essential service of load control, inserted by Clause 6 of the Bill, applies only to organisations which carry out activities for system-balancing purposes.

Show the amendment's own text

Clause 6, page 4, line 31, after “controller” insert “—

(a) which carries on activities for system-balancing purposes (whether or not it also carries on other activities), and”

Show the Bill text this amendment would change (Clause 6: Designation of large load controllers as operators of an essential service, as it stood in HL Bill 32 (as brought from the Commons))

(1) Paragraph 1 of Schedule 2 to the NIS Regulations (essential services and threshold requirements: electricity subsector) is amended as follows.

(2) After sub-paragraph (5) insert—

(5A) For the essential service of load control, the threshold requirement in the United Kingdom is a load controller whose potential electrical control, in relation to relevant ESAs managed by the controller, is equal to or greater than 300 megawatts.

(5B) For the purposes of sub-paragraph (5A), a load controller’s potential electrical control, in relation to relevant ESAs managed by it, is the aggregate of—

(a) the maximum flow of electricity into all of those relevant ESAs (taken together), and

(b) the maximum flow of electricity out of all of those relevant ESAs (taken together),

(5C) For the purposes of this paragraph—

(a) “relevant ESA” means an energy smart appliance (as defined by section 238(2) of the Energy Act 2023) which is any of the following—

(i) an electric vehicle;

(ii) a charge point (for electric vehicles);

(iii) an electrical heating appliance;

(iv) a battery energy storage system;

(v) a virtual power plant;

(b) a relevant ESA is “managed” by a person if the person controls the flow of electricity into and out of the relevant ESA by way of load control signals sent by the person to the relevant ESA;

(c) the maximum flow of electricity into or out of a particular relevant ESA is to be determined by reference to the electrical capacity of the relevant ESA as stated by the manufacturer of the relevant ESA.

(5D) Where load control signals are sent to a relevant ESA by a person (an “intermediary”) acting under the direction of or on behalf of a load controller, that relevant ESA is to be treated for the purposes of this paragraph as managed by the load controller (and not by the intermediary) unless sub-paragraph (5E) applies.

(5E) Where the intermediary is capable of adjusting or processing the load control signals sent to a relevant ESA, and is authorised by the load controller to do so—

(a) the relevant ESA is to be treated for the purposes of this paragraph as managed by both the load controller and the intermediary, and

(b) the intermediary is also to be treated for those purposes as a load controller.

(3) In sub-paragraph (8)—

(a) after paragraph (a) insert—;

(aa) “charge point” has the same meaning as in Part 2 of the Automated and Electric Vehicles Act 2018 (see section 9 of that Act);

(b) after paragraph (c) insert—;

(ca) “electric vehicle” means a vehicle which is capable of being propelled by electrical power derived from a storage battery;

(cb) “electrical heating appliance” means any of the following—

(i) a hydronic heat pump;

(ii) a hot water heat pump;

(iii) a hybrid heat pump;

(iv) a direct electric hot water cylinder;

(v) an electric storage heater;

(vi) a heat battery;

(c) after paragraph (g) insert—.

(ga) “load control” and “load control signal” have the same meaning as in Part 9 of the Energy Act 2023 (see section 238 of that Act), and “load controller” means a person which provides the service of load control;

View the full Bill text on the UK Parliament website →

Sponsors

Baroness Lloyd of Effra Labour

How members argued on this amendment, by party
No party data
1 for · 0 against (n=1)

Arguments made about this amendment

For (1)

for4 Baroness Lloyd of Effra (Lab)

Defining 'system-balancing purposes' clarifies the load control threshold without changing the policy intention, reducing the risk of misinterpretation.

Against (0)

None extracted yet.