NC54
What it would do
This new clause introduces a national strategy for digital signalling rollout to create an approach to signalling renewals, enhancements, and interfaces with rolling stock, and to realise signalling safety, capacity, and performance benefits of digital signalling.
Show the amendment's own text
To move the following Clause—
“National signalling strategy
(1) Within 12 months of the passing of this Act and every subsequent 12 months, Great British Railways must publish a national signalling strategy.
(2) Each strategy under subsection (1) must set out expected signalling renewal requirements by operating region and route.
(3) Signalling requirements as set out in subsection (2) must be informed by the principle that new or renewed signalling will be digital and based on standards set by the European Train Control System.
(4) Great British Railways must align each strategy to—
(a) the infrastructure capacity plan in section 60,
(b) the rail strategy in section 15,
(c) each funding period as set out in schedule 2, and
(d) current and future planned infrastructure including electrification and rolling stock changes.
(5) Great British Railways must set out how each strategy is used to inform procurement, leasing and allocation decisions.”
Sponsors
Olly Glover Liberal Democrat
Arguments made about this amendment
For (2)
A national digital signalling strategy, based on ETCS, is needed because a fragmented structure makes rollout harder, and it would bring safety, capacity and performance benefits.
A national signalling strategy is a sensible approach that would not normally belong in primary legislation, but is needed because the Government has not provided assurance elsewhere.
Against (1)
Network Rail has already published its digital signalling approach for 2024 to 2029, which GBR will take over and develop in its business plans.