That's Debatable

NC21

Stage: Committee stage · Decision: Withdrawn · Liberal Democrat

What it would do

This new clause mandates an annual review of public road level crossings that identifies high-delay crossings, assesses their cost and how this cost could be mitigated and mandates a feasibility and engineering study to produce congestion relief solutions for high-delay crossings.

Show the amendment's own text

To move the following Clause—

“Review of public road level crossings

(1) Great British Railways must conduct an annual review of all public road level crossings on the railway network.

(2) The purposes of the review as set out in subsection (1) is to identify and mitigate severe road traffic congestion.

(3) A review under this section must include—

(a) a list of all crossings which are high-delay crossings within the meaning of subsection (12);

(b) a report on of the economic and social impact of each high-delay crossing;

(c) a report on the feasibility of replacing each high-delay crossing with an alternative means of crossing the relevant railway line.

(4) A report under paragraph (3)(b) of this section must include—

(a) an appraisal of the economic cost and social impact on the local area resulting from the closure of public roads on which any high-delay level crossing is situated;

(b) an assessment of the average delay to journeys undertaken on the public road by emergency vehicles and goods vehicles;

(c) a mitigation plan, for implementation in the short-term, describing potential operational changes to the high-delay crossing and public road to achieve a reduction in road closure, provided that such changes must be—

(i) implementable as soon as is reasonably practicable;

(ii) have no detrimental effect on the safety of any user of the high-delay crossing or public road.

(5) Within eighteen months of any crossing being for the first time added to the list of high-delay crossings provided for in paragraph 3(a), Great British Railways must commission a feasibility and engineering study relating to the crossing (“a study”).

(6) A study must consider the technical and economic viability of options for relieving traffic congestion on the public road where the high-delay crossing is situated, including options for alternative means for the public road to cross the railway line.

(7) Options considered by a study for the purpose of subsection (6) include—

(a) a supplementary high-capacity road crossing;

(b) the construction of a road bridge or under-tunnel.

(8) A study must include—

(a) the estimated cost;

(b) an assessment of engineering complexity;

(c) any possible land acquisition requirements;

(d) an assessment of environmental impact of each option.

(9) Great British Railways may exclude an option from a study where Great British Railways reasonable believes that—

(a) there is a possible detrimental effect on public safety associated with the option, or

(b) the local authority for the area of including the high-delay crossing does not support the option.

(10) A report on a study must be presented to the Secretary of State and relevant local highway authority within two years beginning on the day on which it is commissioned.

(11) A report under subsection (1) must include detailed costings and a recommended option for best achieving the purpose set out in subsection (6).

(12) In this section, a “high-delay crossing” is any public road level crossing where the total closure time of the public road to traffic exceeds 30 per cent of any given hour during standard peak traffic periods.”

Sponsors

Mr Lee Dillon Liberal Democrat, Olly Glover Liberal Democrat, Josh Babarinde Liberal Democrat, Tessa Munt Liberal Democrat, Cameron Thomas Liberal Democrat, John Milne Liberal Democrat, Claire Young Liberal Democrat, Sarah Gibson Liberal Democrat, Martin Wrigley Liberal Democrat, Helen Morgan Liberal Democrat

How members argued on this amendment, by party
No party data
2 for · 1 against (n=3)

Arguments made about this amendment

For (2)

forNC21 Olly Glover

High-delay level crossings impose congestion costs on the economy, hinder local development and affect emergency services, so annual review and feasibility studies are needed (citing Thatcham).

level crossings congestion and economic cost
forNC21 Jerome Mayhew

The Conservatives support the intention behind the level crossing review and want GBR to avoid Network Rail's approach, though an annual review may be too onerous.

level crossings reporting burden

Against (1)

againstNC21 Keir Mather

The annual review and studies would impose disproportionate administrative burdens and divert resources from core railway management, while GBR is already bound by safety duties and must consider community impacts.

reporting burden existing regulation