That's Debatable

Remediation standard

Within Tolerable risk and safety standards · Scoped to Committee stage (Commons) — see across the whole Bill →

8 for · 3 against

Total across everything below — "on the Bill as a whole" and every amendment group combined. See each section's own figures for what "for"/"against" means there specifically.

How members argued, by party (Commons)
No party data
4 for · 2 against (n=6)

On the Bill as a whole

For (4)

forthe Bill The Minister for Homelessness, Democracy, Communities and Faith (Florence Eshalomi)

The Minister argues that a risk-based 'tolerable' endpoint is a proportionate standard for remediation, and that 'permanent' means residents must not depend on temporary measures such as waking watches or decanting.

forthe Bill Florence Eshalomi

The Minister argues that there is currently sufficient assessor capacity for expected demand, though the market is finely balanced, and that the Bill sets a clear endpoint of eliminating or reducing risk to a tolerable level on a permanent basis.

forthe Bill Gareth Bacon

The Opposition remains broadly supportive of what the Government seeks to achieve with the Bill, and praises the Minister's conduct of the Committee.

forthe Bill Gideon Amos

The Liberal Democrat speaker supports the thrust of the Bill while retaining serious reservations.

Against (2)

againstthe Bill Sarah Gibson (Chippenham) (LD)

Sarah Gibson argues that the ambiguous word 'tolerable' would produce case-by-case disputes and delay, adding to existing assessor and decision-making problems and favouring the legal profession.

againstthe Bill Gideon Amos

The Bill lacks an objective standard for remediation; if one is not provided, people should at least be told when remediation conclusions have been reached for their buildings.

On specific amendments

"For"/"against" here means for or against that amendment passing — not the bill. An amendment can itself cut either way (e.g. one that deletes a clause), so check what the amendment does before reading the stance as pro- or anti-bill.

NC1 — NegativedOnDivision Liberal Democrat

This new clause replaces the "tolerable risk" standard in clause 44 with an objective statutory requirement anchored in Requirement B4(1) in Schedule 1 of the Building Regulations 2010; and Building Regulation 7(2).

For (1)

forNC1 Gideon Amos

Remediation should be held to the same objective external-wall standard as new homes, namely Requirement B4(1) of the Building Regulations, rather than a lower standard.

Against (1)

againstNC1 Florence Eshalomi

The Minister argues that the Building Regulations govern standards for new building works and are not the right test for deciding whether the fire risk that prompted remediation has been addressed.

1 — NegativedOnDivision Liberal Democrat

This amendment removes the subjective "intolerable risk" assessment threshold in Clause 3(1)(b). It requires external wall assessors to certify whether external walls meet the objective combustibility standards of Building Regulation 7(2), regardless of height limitations in Regulation 7(4), or otherwise recommend remediation to achieve that standard.

For (1)

for1 Sarah Gibson

Sarah Gibson argues that the ambiguity of 'tolerable' in PAS 9980 needs replacing with clear standards so that assessors, residents, insurers and lenders can rely on the outcome, and that building regulations should control building safety.

Against (0)

None.

17 — NegativedOnDivision Liberal Democrat

This amendment with Amendments 18 and 19 ensures that all secondary legislation setting technical building safety standards, assessment methodologies, and remediation definitions is subject to the affirmative parliamentary procedure.

For (1)

for17 Gideon Amos

Secondary legislation setting the remediation standard should be subject to the affirmative procedure because the standard is important and should be debated in the House.

Against (0)

None.

4 — NotCalled Liberal Democrat

This amendment is consequential on NC1.

For (1)

for4 Gideon Amos

The remediation standard should be the objective requirement B4(1) of the Building Regulations, the same standard new homes must meet, rather than a lower standard for remediation.

Against (0)

None.