What it would do
This amendment would set out when an activity is carried on for “system-balancing purposes” for the purposes of my other amendment to Clause 6.
Show the amendment's own text
Clause 6, page 5, line 5, at end insert—
“(za) an activity is carried on for “system-balancing purposes” if it is carried on with a view to contributing to the balancing, flexibility, security or stability of the electricity system as a whole or a significant part of it;”
Show the Bill text this amendment would change (Clause 6: Designation of large load controllers as operators of an essential service, as it stood in HL Bill 32 (as brought from the Commons))
(1) Paragraph 1 of Schedule 2 to the NIS Regulations (essential services and threshold requirements: electricity subsector) is amended as follows.
(2) After sub-paragraph (5) insert—
(5A) For the essential service of load control, the threshold requirement in the United Kingdom is a load controller whose potential electrical control, in relation to relevant ESAs managed by the controller, is equal to or greater than 300 megawatts.
(5B) For the purposes of sub-paragraph (5A), a load controller’s potential electrical control, in relation to relevant ESAs managed by it, is the aggregate of—
(a) the maximum flow of electricity into all of those relevant ESAs (taken together), and
(b) the maximum flow of electricity out of all of those relevant ESAs (taken together),
(5C) For the purposes of this paragraph—
(a) “relevant ESA” means an energy smart appliance (as defined by section 238(2) of the Energy Act 2023) which is any of the following—
(i) an electric vehicle;
(ii) a charge point (for electric vehicles);
(iii) an electrical heating appliance;
(iv) a battery energy storage system;
(v) a virtual power plant;
(b) a relevant ESA is “managed” by a person if the person controls the flow of electricity into and out of the relevant ESA by way of load control signals sent by the person to the relevant ESA;
(c) the maximum flow of electricity into or out of a particular relevant ESA is to be determined by reference to the electrical capacity of the relevant ESA as stated by the manufacturer of the relevant ESA.
(5D) Where load control signals are sent to a relevant ESA by a person (an “intermediary”) acting under the direction of or on behalf of a load controller, that relevant ESA is to be treated for the purposes of this paragraph as managed by the load controller (and not by the intermediary) unless sub-paragraph (5E) applies.
(5E) Where the intermediary is capable of adjusting or processing the load control signals sent to a relevant ESA, and is authorised by the load controller to do so—
(a) the relevant ESA is to be treated for the purposes of this paragraph as managed by both the load controller and the intermediary, and
(b) the intermediary is also to be treated for those purposes as a load controller.
(3) In sub-paragraph (8)—
(a) after paragraph (a) insert—;
(aa) “charge point” has the same meaning as in Part 2 of the Automated and Electric Vehicles Act 2018 (see section 9 of that Act);
(b) after paragraph (c) insert—;
(ca) “electric vehicle” means a vehicle which is capable of being propelled by electrical power derived from a storage battery;
(cb) “electrical heating appliance” means any of the following—
(i) a hydronic heat pump;
(ii) a hot water heat pump;
(iii) a hybrid heat pump;
(iv) a direct electric hot water cylinder;
(v) an electric storage heater;
(vi) a heat battery;
(c) after paragraph (g) insert—.
(ga) “load control” and “load control signal” have the same meaning as in Part 9 of the Energy Act 2023 (see section 238 of that Act), and “load controller” means a person which provides the service of load control;
Sponsors
Baroness Lloyd of Effra Labour
Arguments made about this amendment
For (0)
None extracted yet.
Against (0)
None extracted yet.